In summary, the provided text details the launch of the Nuri space launch vehicle from the Naro Space Center. The countdown begins, and various stages of the launch are described, including engine ignition, stage separations, and satellite deployments. The launch progresses smoothly, reaching a target altitude of 700 km and confirming successful satellite deployments. The text also mentions tracking stations in different locations and the anticipation of successful communication with the satellite. Overall, the launch is a success with all core processes completed in approximately 16 minutes.
Here are the key facts extracted from the text:
1. The countdown for the launch begins.
2. The launch involves stages: 1st, 2nd, and 3rd stages.
3. The Nuriho was successfully launched from the Naro Space Center.
4. The launch process involved engine ignition and stage separation.
5. The Nuriho reached altitudes of 59km, 100km, 200km, 400km, 500km, 600km, and 700km.
6. The 3rd stage engine ignited and pushed the satellite into orbit.
7. Performance verification satellite separation was confirmed.
8. Dummy satellite separation followed the performance verification satellite separation.
9. All core processes were completed within 16 minutes of launch.
Please note that these facts are presented in the order they appear in the text.