The summary is:
This is a transcript of a video about building a house from sip panels in four days. The video shows the process of assembling the panels, installing the foundation, walls, ceiling, and roof. The video also mentions the materials and tools used, such as foam, nails, and jacks. The video ends with the completion of the main work and the delivery of the house to the customer.
Here are the key facts extracted from the text:
1. The text is a transcript of a video about building a house from SIP panels.
2. The house is not a usual one for the builders, as they only build five walls and leave the rest for the customer.
3. The house is built in six days, from Monday to Saturday.
4. The builders use professional mounting foam, chamber-dried timber, galvanized nails and other materials to ensure quality and durability.
5. The house has nine narrow windows, one internal wall and an attic floor.
6. The builders use a nail gun, jacks, wedges and other tools to assemble the panels and the ceiling.
7. The builders check the dimensions, diagonals and geometry of the panels and the foundation several times to avoid inaccuracies and gaps.
8. The builders treat the wood with antiseptic and leave a propaganda gap between the panels for thermal expansion and moisture protection.