Here is a concise summary of the article:
**Starship Updates**
* SpaceX has revealed its Starship flight schedule for the next 5 years.
* The second orbital Starship is complete, and NASA plans to launch a Starship space station before the ISS is decommissioned.
* SpaceX is preparing for the next Starship launch, with the FAA expected to release a license this month.
* The company is also working on new Starship prototypes, including Ship 26 and Ship 28, which will be capable of carrying Starlink satellites.
**SpaceX Roadmap**
* SpaceX plans to launch a Starship with cargo in early 2024.
* The company aims to recover a Starship by the third quarter of 2024.
* In 2025, SpaceX will work on developing an on-orbit fuel storage version of the Starship.
* In 2026, the company plans to use Starship for in-orbit satellite tune-ups and repairs.
* By 2028, SpaceX aims to launch a full-fledged low-Earth orbit Starship station.
**Other Space News**
* NASA's Psyche mission, which aims to study a metal-rich asteroid, has been delayed until October 12th.
* The mission will use a Hall thruster to propel the spacecraft, which is expected to take nearly six years to reach its destination.
* Artemis II is making progress, with the core stage of the Space Launch System receiving its four RS-25 engines.
* The mission is expected to launch in 2024, with the crew of four rehearsing their launch day activities.
**SpaceX Testing**
* SpaceX is conducting cryogenic testing on Ship 29 at its Massey test site.
* The company is also testing a new prototype, S24.2, which is designed to study the payload bay of the Starship.
* The test is expected to provide valuable insights into the design and functionality of the Starship's payload bay.
1. The flight schedule for the next 5 years of Starship has been revealed.
2. The second orbital Starship is back in one piece.
3. NASA expects to have a Starship space station before the ISS is decommissioned.
4. NASA has delayed the next asteroid mission.
5. Artemis II is seeing massive progress.
6. The perseverance of SpaceX’s workers has led to a cleaner and more advanced Starbase.
7. SpaceX has plans for Starship up to 2029.
8. A quick tweak session to Super Heavy Booster 9 has been completed.
9. Ship 25 and Booster 9 hold the record for the tallest rocket ever erected.
10. A disconnect retraction test has been carried out on the arm that feeds power and propellant to the Starship.
11. A special bill has been passed, preventing a government shutdown in the US for at least another 45 days.
12. The FAA has issued a Temporary Flight Restriction notice for Starbase.
13. The FAA's review of SpaceX’s newest flame deflector and deluge system could take anywhere from 30 to 135 days.
14. Ship 26 and Booster 10 are almost ready for their static fire test.
15. The 33 Raptor engines are expected to be attached to the Orbital Launch Mount soon.
16. Ship 28 and Booster 11 are also getting their finishing touches.
17. SpaceX is planning to use Starship for in-orbit satellite tune-ups in 2026.
18. The grand debut of a Starship with cargo on board is scheduled for the early part of 2024.
19. SpaceX is eyeing a Starship recovery by the third quarter of next year.
20. By 2025, SpaceX will sketch out the on-orbit fuel storage version of the Starship.
21. By 2028, SpaceX will take a hard look at the final blueprint of a full-fledged low earth orbit Starship station.
22. Ship 29 and Ship 27 are currently undergoing testing at Massey’s test site.
23. Ship 24.2, a prototype, is being tested at Massey’s.
24. NASA's mission Psyche, focused on studying an asteroid with the same name, is set to launch on October 12th.
25. The spacecraft will reach its destination in August 2029.
26. The Psyche spacecraft will be studying what Psyche is made of, analyzing its gravity, and making maps of its surface for at least 26 months.
27. The core stage of the second Space Launch System got its four RS-25 engines at NASA’s Michoud Assembly Facility in New Orleans.
28. The two huge solid rocket boosters for the Space Launch System are being pieced together.
29. The Artemis II crew has rehearsed their launch day activities.
30. The launch of Artemis II might slide into 2025.