Tony | Cuộc Thi Làm Đèn POKEMON💡 𝐏𝐨𝐤𝐞𝐦𝐨𝐧 𝐋𝐚𝐦𝐩 - Summary

Summary

Here is a concise summary of the provided transcript:

**Context:** A group of friends are participating in a creative project, divided into teams.

**Project:** Create decorative Pokémon lights using epoxy glue and small models, with a twist (Fire, Water, or Electric Pokémon).

**Summary:**

* Teams gather, discuss, and prepare materials for the project.
* Each team works on their assigned Pokémon theme, facing various challenges (e.g., model size, glue drying, design precision).
* Upon completion, a judge (Mr. Vinh) evaluates each team's work, providing feedback and scoring:
+ Team 1 (Electric Pokémon): 8 points (deductions for glue stains, old model, and rock adhesion).
+ Team 2 (Water Pokémon): 9 points (minor issue with blurry color).
+ Team 3 (Fire Pokémon): 9 points (deduction for smeared color and glue, and sole quality).
* The two top-scoring teams are promised a reward of 1,000,000 VND at the end of the month.
* The video concludes with a call to action, encouraging viewers to subscribe and support the channel.

Facts

Here are the extracted key facts, each with a number and in short sentences, excluding opinions:

**Project Details**

1. The project involves creating Pokémon Lights with Epoxy Glue.
2. The theme is divided into three types: Fire Pokémon, Water Pokémon, and Electric Pokémon.

**Locations and Shopping**

3. A grocery store in front of the filming location sells model toys.
4. The group visited at least two grocery stores to buy Pokémon models.
5. A store sells small models for 75,000 VND.

**Transactions and Costs**

6. One participant had 50,000 VND and another had to cover the remaining amount for a purchase.
7. A seashell to decorate a model costs more than 100,000 VND.

**Materials and Tools**

8. Materials used include epoxy glue, LED strings, color jars, and candle glue.
9. Tools used include a drill and UV light for quick drying.

**Timeline and Completion**

10. The project involves multiple teams working on their respective themes.
11. Teams were expected to complete their projects within a set timeframe.
12. The first team to finish received a 1-point bonus.

**Judging and Prizes**

13. Mr. Vinh was the judge for the project.
14. The judging criteria included completion time, appearance, and technique.
15. Two teams received 9 points, and one team received 8 points.
16. The winning team(s) will receive 1,000,000 VND at the end of the month.