Here is a concise summary of the bathroom remodel project:
**Project Overview:**
* Remodel of a small, 6x5 foot contractor-grade bathroom
* Goal: Give the bathroom a whole new look with a custom tiled shower surround and new fixtures
**Key Steps:**
1. **Demolition:**
* Removed old fixtures, flooring, and shower surround
* Donated or sold reusable items
2. **Shower Area:**
* Installed Delta UpStyle wall system and bathtub
* Custom accent channel with hexagonal mosaic tile
* Specialized sealant used for acrylic material
3. **Additional Upgrades:**
* New flooring (large format white tile)
* Painted walls (light gray)
* New light fixture
* Everly line (Delta) fixtures for shower and vanity
* New Delta toilet and mirror
**Outcome:**
* Transformed the look and feel of the small bathroom
* Links to materials and tools used are provided in the video description.
Here are the key facts extracted from the text, numbered and in short sentences, excluding opinions:
**Bathroom Specifications**
1. The bathroom size is 6 feet by 5 feet, excluding the bathtub.
2. The bathroom has two doors.
3. The original bathroom had a contractor basic package with bland flooring, a sheet mirror, generic lights, and a basic shower.
**Removal of Old Fixtures**
4. The toilet and vanity were removed by unfastening them.
5. The mirror was glued to the wall and required finesse to remove.
6. Old fixtures that still worked were donated or sold.
**Shower Removal**
7. The one-piece shower surround was removed by hacking it to bits.
8. A 9-inch wide strip of plywood was used to score a line around the walls above the surround.
**Tub and Wall Installation**
9. A new tub was installed, requiring plumbing connections to be moved.
10. A licensed plumber is recommended for this task.
11. Furring strips on the wall supported the up-style wall system.
12. The wall system was secured to studs with panhead screws and shims.
**Tile Installation**
13. A modern white large format tile was used for the flooring.
14. Hexagonal mosaic tile was used for the custom accent channel.
15. Special sealant (DAP 3.0) was used for the acrylic material.
**Grouting and Caulking**
16. Unsanded grout was used for the mosaic tiles.
17. Painters tape and clear plastic were used to protect surrounding areas.
18. DAP 3.0 was initially used for caulking, but its performance was later questioned.
**Drywall Repair**
19. Straight drywall strips were used to cover the back wall and lower portions of the side wall.
20. L-shaped pieces were cut for the corners using a multi-tool.
**Final Installation**
21. New shower hardware (Everly line from Delta) was installed.
22. A new Delta toilet, vanity with Everly style faucet, and mirror were installed to complete the renovation.