The video showcases the final stages of building a miniature house. The builders discuss the importance of a roof in a real house and how they've been working on the house without one. They then proceed to install various components, including windows, doors, and tiles. The windows are designed to be functional, with moving parts and shutters. The builders also create a wooden frame to support the roof and install tiles made of laser-cut MDF. They use different types of tiles, including ceramic and fiber cement, and discuss their advantages and disadvantages. The video also covers the installation of a lining on the ceiling to isolate the roof from the rest of the house and provide thermal comfort. Finally, the builders add finishing touches, including painting, planting, and simulating a vine climbing the wall. The video concludes with the completion of the miniature house, and the builders thank their sponsor, Amigo Construtor, for their support throughout the project.
1. The project is building a house.
2. The house is almost finished but is missing a roof.
3. The roof is important to prevent rain from entering the house.
4. The team has designed and laser-cut the parts for the windows and doors.
5. Each window is made up of 20 pieces.
6. The team is using hot glue to fix the windows in place.
7. There are different types of tiles that can be used for the roof, including fiber cement and ceramic tiles.
8. Ceramic tiles have better thermal and acoustic insulation than fiber cement tiles.
9. The team has chosen to use French ceramic tiles for the roof.
10. The tiles are made of laser-cut MDF to achieve a 3D design.
11. The roof structure includes a cross, purlins, rafters, and slats.
12. The team is using a caliper to ensure the spacing between the slats is perfect.
13. A ridge tile is used at the top of the roof.
14. The team is using MDF to create a lining for the ceiling.
15. The lining is important for thermal comfort and to isolate the roof from the rest of the house.
16. The team is painting the MDF boards white to resemble plaster.
17. The house is finally complete after over a year and a half of work.
18. Amigo Construtor has been the team's support throughout the project.
19. The team has used Amigo Construtor's online store for building materials.